Spencer Elwart Team lead
Structural lead. Floor plan, walls, windows, slab
Home remodeling, and drive-by-wire work on military vehicles.
- Laid out the ranch plan: 1,200 sq ft inside a 62 x 22 ft shell, all three bedrooms on the sunny south face, and a 6 x 6 ft airlock for snowy boots.
- Moved the team to ICF on all four walls after finding cinder block only reaches R-2.5.
- Had Vetta design and quote 17 triple-pane, Phius-certified windows at SHGC 0.353.
- Talked the kitchen, living room and master suite through with interior designers.
- Built the house in Revit and drew the West Elevation with the 28 ft long, 7 ft tall berm.
- Kept the structural budget: $152,911.84, about $4,000 lighter after a framing cut on April 16.
In the chatI think we should move forward with ICF brick construction. Also the cost isn't terrible...
Woke from a 10 PM nap wide awake and wrote most of his final paper overnight.
CodesIRC Ch. 3 to 6, ACI 318, ACI 332, ASCE 7