Sebastien Pruneau Team lead
Power lead. System design and the mechanical room
Mechanical and electrical double major. Led his EE senior project.
- Chose the architecture: a Sol-Ark hybrid inverter, LiFePO4 storage and ground-mounted bifacial panels.
- Built the appliance list and the shared energy budget with mechanical.
- Caught, after midnight on PDR night, that inverter idle draw alone was eating 2 kWh a day.
- Defined critical mode: the inverter drops out and the essentials run on DC at about 1.1 kWh a day.
- Turned the panels sideways to clear the 30 in code height at a 41.8° tilt.
- Set up the Revit central models and drew the mechanical room and wiring sheets.
In the chatWhat if we mount the panel sideways. Now the sin^-1(30"/45") = 41.8 degrees?
Argued down the auto-start generator: if it fires at low battery, there is no point in critical mode.
CodesNEC 110, 240, 250, 300, 310, 411, 480, 690, 694, 705, 706, 708, 710